Replacing a Concrete Tile Roof with Long Run Roofing Iron.

Concrete tiles are significantly heavier than long run roofing iron so concrete tile roofs can put a lot of weight and pressure and structural demand on your home.  Replacing a concrete tile roof with lightweight long run roofing iron can take 10-12 tonnes of concrete bulk from your roof. This weight can damage your home  […]
uncategorised

Replacing a Concrete Tile Roof with Long Run Roofing Iron.

Concrete tiles are significantly heavier than long run roofing iron so concrete tile roofs can put a lot of weight and pressure and structural demand on your home.  Replacing a concrete tile roof with lightweight long run roofing iron can take 10-12 tonnes of concrete bulk from your roof. This weight can damage your home  or cause your roof to fail.

If your concrete tiles have cracks or are broken, this will be a cause for leaks and time to consider a new roof.

If there are signs of structural sagging, either on the inside of your roof or on the outside, then a roof replacement with long run roofing is an excellent solution to protect your home  from structural damage and to keep your roof safe before any further damage occurs.

Roof Wellington completes conversions from concrete tiles to long-run roofing with stunning results.

A concrete tile conversion will always require scaffolding platforms for safety requirements. Skip bins are organized for disposal of the concrete and the tiles are removed one by one from the roof. Once the tiles have been removed we install new timber purlins throughout the existing roofing frame to create the fixing requirements for the new long-run roofing. The installation of purlins can also be completed with packing to help eliminate some of the undulation of the roofing frame that occurs from the weight of the concrete that had been sitting on the roof for a long period of time. Concrete tiles roofs can be completed in stages with temporary flashings between areas completed and yet to be. 

The labour for a concrete tile converstion re-roof project is the highest as the heavy tiles take much longer to remove than other roofing types. Depending on the size of your roof, we would estimate 3-6 weeks to complete a re-roof with long run roofing iron but it is well worth it to protect your home with a pristine new long run metal roof.

Related Posts

Get A Free Quote 

If you need roofing advice or have any questions about your roof, contact the Roof Wellington team on 0800 766 393. We can manage your entire roofing project from start to finish - removing any guesswork and uncertainty. Rest assured that your roofing project is in the very best hands with the Roof Wellington team.
Call us now
Roofwellington Logo Simplified Light Grey For Website 500px
Layer 578 Coloursteel LogoLayer 580 Colourcote Logo

Contact Us

Get your free roof replacement quote from Roof Wellington. Please fill out the form or call 0800766393 for your free roof replacement quote.
0800 766 393
Contact Form
Terms & Conditions
|
Roof Wellington © 2024
|
Privacy Policy
Web Design & Development by
Colour Picker Tab
chevron-uparrow-down